Kwania District Gets UGX 600m for Construction of Administration Block

Comments 384 Views Kwania, Uganda
A wing of the building raised to the next sabbing level.

A wing of the building raised to the next sabbing level.

In short
The construction of the two-storied building which is expected to cost approximately 4.5 billion shillings started with 600 million shillings from the transition fund which was given to the District to facilitate its operation.

 

IP: 3.234.245.125. Referrer: . FirstClickFree: 0. Clicks by IP: ?. Clicks by cookie: ?.